Page 106 - Euless ORD 2360 Adopted FY 23-24 Budget
P. 106
City of Euless
Capital Project Request
March 16, 2022
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REP — CEDAR HILL ESTATES SOUTH PHASE I
Project Type: WASTEWATER Sub - Type: MAIN REPLACEMENT
Project Code: WW2301 Priority: A
COUNCIL AUTHORIZATION:
November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract
with Plummer Associates, Inc. for the design of the FY2023 Sanitary Sewer Rehabilitation Project.
RELATIONSHIP TO OTHER PROJECTS AND/ OR MASTER PLAN:
The wastewater mains included in this project are part of the City' s Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along Sunset Drive between Vine Street and South Main Street and
2. Along Henslee Drive between Whitener Road and Sunset Drive.
PROJECT SCHEDULE:
Began Design: December 2022
Anticipate Design Complete: August 2023
Anticipate Begin Construction: January 2024
Anticipate Construction Complete: September 2024
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/ infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
problems.
Ordinance No. 2360, Page 106 of 326
42