Page 259 - BurlesonFY24AdoptedBudget
P. 259
Engineering
PERMIT/SERVICE FEE
10% (residential) or 20% (commercial and industrial) of the following paid at submittal with
1. Construction Plan Review
balance due prior to Notice to Proceed for Public Improvements
A. Residential $500 + $87.98 per hour x 4.28 hours x number of lots
B. Commercial $500 + $87.98 per hour x 3.44 hours x number of acres (up to 15 acres)
C. Industrial (new) $1,000.00 + $87.98 per hour
2. Construction Inspection ($500.00 + the following costs)
A. Water Line $0.88 per linear foot
B. Sewer Line $0.88 per linear foot
C. Storm Sewer $1.32 per linear foot
D. Roadway Paving (public and private) $1.14 per square yard
E. Sidewalk / Trail $2.79 per square yard
F. Handicap Ramps $28.39 each
G. Water and Sewer Services $17.39 each
H. Sewer Manholes $37.26 each
I. Storm Manholes / Inlets $37.26 each
J. Lift Station $1,242 each
K. Public Infrastructure not listed (includes private storm infrastructure $49.68 per hour (estimated prior to Notice to Proceed for Public Improvements)
associated with roadway)
L. Final Inspections $49.68 per hour (Two hour minimum)
M. Construction Materials Testing Applicant pays directly to City-approved vendor
3. Inspection Overtime Rate $74.52 per hour (Two hour minimum)
4. Closing / Abandoning of
A. Right-of-Way $550.00
B. Easement $250.00
5. Sign Installation $250.00 per sign
6. Easement/Right of Way Use Agreement $125.00
7. Traffic Study Fee $1,400.00
8. Flood Study Reviews (Includes detention/retention analysis) $1 per foot of reach length ($2,000 minimum)
Environmental Health
PERMIT/SERVICE FEE
1. Food Safety Inspection Fees
A. Grocery
1. ≤ 5,000 sq. ft. $275
2. > 5,000 sq. ft. $400
B. Food Service
1. ≤ 500 sq. ft. $150
2. > 500 ≤ 1,500 sq. ft. $200
3. > 1,500 ≤ 3,000 sq. ft. $275
4. > 3,000 ≤ 6,000 sq. ft. $350
5. > 6,000 sq. ft. $400
C. Child Care Food Service $150
D. Catering Operation $250
E. Temporary Food Service $50
F. Food Court $200 per establishment
G. Adjunct Operation
1. Food Service $150 per independent operation
2. Food Store ≤ 5,000 sq. ft. $150 per independent operation
3. Food Store > 5,000 sq. ft. $200 per independent operation
H. Commissary
1. No food prep $100
2. With food prep $200
I. Mobile Units
1. Prepackaged food only $100
2. Open and/or food prep $200
3. Push Carts $200
J. Plan Review
1. ≤ 500 sq. ft. $0
2. >500 ≤ 3,000 sq. ft. $50
3. >3,000 sq. ft. $100
The late fee increases 10% for each 30 day block until permit fee and late fee is paid. Permits
K. Late Fee
that are more than 90 days overdue will be required to be rapplied for.
1. From 1-30 days 10% of fee owed
2. From 31-60 days 20% of fee owed
2. On-site sewage facility fees DETERMINED BY TARRANT COUNTY
A. New System
1. Application Fee $0
2. Water research fee $10
259
259