Page 117 - ArlingtonFY24AdoptedBudget
P. 117

Business Plan




                                                     Public Safety


                 Goal 1: Utilize Targeted Initiatives and Industry Best Practices and Policies to Foster a Safe
                                                        Environment
                                              Objective 2: Protect Public Well-being
                          Project                   Performance Measure(s)                Department(s)
             Core  Library Emergency and Safety   Achieve quarterly target goals   Library
             PS    Plan
             1.2.3
             Summary:
                                                               Timeline:
             The Library will update its Facility Emergency and Safety   •   1  and 2  Quarters: Conduct a SWOT analysis of
                                                                             nd
                                                                        st
             Plan processes and procedures to align with industry      each location in the library system
             standards and the City of Arlington protocols. The Library   •   1  – 4  Quarter: Design Emergency Plan based on
                                                                           th
                                                                        st
             will work in concert with and under the guidance of Risk   the framework provided by Risk Management for
             Management, Office of Emergency Management, APD, and      all sever library locations.
             AFD. With seven facilities of various sizes and       •   4  Quarter: Conduct training with staff on various
                                                                        th
             configurations delivering public service during extended   emergency scenarios
             hours, developing emergency plans that help staff respond   •   4  Quarter: Develop an after-action analysis and
                                                                        th
             appropriately is vital for staff and patron safety. Areas to   planning framework
             be evaluated include but are not limited to necessary
             equipment such as panic buttons, additional cameras, staff
             training and established processes and procedures for
             effective emergency and safety planning.

















































            FY 2024 Adopted Budget and Business Plan                                        108                                                                City of Arlington, Texas
   112   113   114   115   116   117   118   119   120   121   122