Page 108 - ArlingtonFY24AdoptedBudget
P. 108

Business Plan




                                       Infrastructure Scorecard (cont.)


                                                                      FY 2021    FY 2022     FY 2023    FY 2024
              Dept.                     Key Measures                  Actual      Actual    Estimate    Target

             AM          Major building components operating within their
                         designed life [annual measures]:
                         Roofs:
                           Asphalt [25 Years of Service Life]             88%         88%        88%        88%
                           Metal [25 Years of Service Life]               68%         68%        68%        68%
                           Built-up [25 Years of Service Life]            68%         68%        68%        68%
                           Modified [25 Years of Service Life]           100%        100%       100%       100%
                           Misc. [25 Years of Service Life]               50%         50%        50%        50%
                         HVAC [15 Years of Service Life]                  59%         60%        59%        59%
                         Generators [20 Years of Service Life]            74%         74%        74%        74%
                         Elevators:
                           High Usage [15 Years of Service Life]          56%         56%        50%        30%
                           Low Usage [35 Years of Service Life]           80%         80%        50%        30%
                         Boilers [25 Years of Service Life]               63%         63%        63%        63%
                         Water Heaters [15 Years of Service Life]         18%         18%        18%        20%
             PWK         Percentage of residential street lane miles swept
                         compared to annual goal of 1,642.25              99%         77%        62%       100%
             PWK         Percentage of pothole repairs completed within 3
                         business days                                    91%         85%        95%        90%
             PWK          Percentage of initial contact with citizens
                         reporting street maintenance concerns occurring
                         within 2 business days                           98%         93%        94%        95%
             PWK         Number of square yards of failed concrete
                         excavated and replaced                         53,495     39,236      23,335     40,000
             Water       Clean a minimum of 20% of sewer lines size 6"-
                         15" estimated to assure compliance with the
                         TCEQ Sanitary Sewer Overflow Initiative         22.5%     41.75%        20%        20%
             Water       Radio Transmitter installations                 7,481      8,704      10,000     10,000
             Water       Linear footage of water and sewer lines designed
                         by the City Engineering staff                  30,187     32,020      30,000     30,000
             Water       High hazard backflow assemblies with certified
                         testing completed                               100%        100%       100%       100%
             Water       Avoid any TCEQ, OSHA, SDWA and NPDES
                         violations                                      100%        100%       100%       100%
             Water       Maintain metered ratio rolling average above
                         88%                                            92.45%     89.57%        92%       > 88%
             Water       Achieve ≤ 8 Sanitary Sewer Overflows per 100
                         miles of sewer main                                 4        4.3          7         ≤ 8
             Water       Interrupt time per customer (hours per customer)   3.395     2.8         < 4        < 4

















             FY 2024 Adopted Budget and Business Plan                                        99                                                                City of Arlington, Texas
   103   104   105   106   107   108   109   110   111   112   113