CIP AND CAPITAL PROJECTS FUNDS



                                 FY2022-2023 STORM DRAIN PROJECTS DISCUSSION

               ❖  Description:    The  Whitley  Road  Phases  1-6  projects  will  make  major  storm  drain
                   improvements along Whitley Road. Currently, there are ditches along Whitley Road that
                   carry the storm water. This storm water will be put under Whitley Road and carried by
                   pipes.

                   Justification:  When we widen Whitley Road, there won’t be room within the right of way
                   for the ditches to carry the storm water. Adding curbs and curb inlets allow us to carry the
                   storm water underground.

                   Operating Impact:  Little to no impact upon operations is anticipated.  This project is paid
                   for with storm drain revenues with the current level of user fee charges.

               ❖  Description:  Drainage Master Plan will expand on the out-of-date drainage master plan
                   that only included the southern portion of the city.  The existing storm drainage system
                   will be evaluated based upon newer drainage criteria.

                   Justification:  The existing drainage master plan is out of date and drainage criteria have
                   changed since it was created.

                   Operating Impact:  Little to no impact upon operations is anticipated.  This project is paid
                   for with storm drain revenues with the current level of user fee charges.


                                 FY2022-2023 WASTEWATER PROJECTS DISCUSSION

               ❖  Description:  The 2019 Wastewater CIP will replace wastewater lines that were identified
                   in the Sewer System Evaluation Survey (SSES) in 2015.  These projects will include
                   Sanitary Sewer Line Replacements throughout the City that have a high amount of inflow
                   and  infiltration  and  need  to  be  replaced.    This  replaces  the  aging  clay  piping  with
                   Polyvinylchloride (PVC) piping in the older parts of the City.  The 2019 Wastewater CIP
                   and Certificates of Obligation proceeds will continue funding for these projects.  A Sewer
                   System Evaluation Survey (SSES) was completed in FY2018-2019 in another section of
                   the city to identify additional high priority projects.  Two separate projects will occur.  The
                   first one will rehabilitate wastewater lines along the following streets:  Hickoryhill Road
                   and Oakhill Road from Whitley Road to Maplehill Road; Echo Hill Drive from Hightower
                   Drive to Chapman Road; and Quail Run from Herschel Drive to Highcrest Drive.  The
                   second project will rehabilitate wastewater lines along the following streets: Whispering
                   Lane from Wooddale Drive to Stardust Drive; Brookdale Drive from Hightower Drive to
                   Ridgecrest  including  Brookdale  Court;  Summit  Ridge  Drive  from  Rufe  Snow  Drive  to
                   Avalon Drive including Summertime Lane; Oaklawn Drive from Mickey Drive to McCoy
                   Drive; Village Park Drive from Greendale Drive to Ridgetop Drive; and Watauga Road
                   from Patsy Lane to Morris Boulevard.  The project will also rehabilitate and repair various
                   sanitary sewer manholes throughout the city.