CITY OF SAGINAW
                          CAPITAL IMPROVEMENT PROJECTS - WASTEWATER
                                                       2020-2026




             Fairmont 12" Sanitary Sewer Replacement
             Scope        Southern Ave. to Sansom Blvd.
             Method       Bore
             Project Cost  $2,624,500
             Fiscal Year  Phase 1 construction was completed in FY 2019-2020, phase 2 in future CIP
                          This line was identified for replacement due to pipeline deterioration and inflow/infiltration
             Description  problems.  Replacing the new line by bore will minimize disturbance to railroad and industrial
                          activities.
             Impact on    Reduced operating costs are expected upon completion of this project.  Any savings in
             Operating    maintenance costs will be allocated to other locations in the wastewater system.  As the
             Budget       infrastructure ages, estimated maintenance cost will be $2,564.


             Infiltration/Inflow (I/I) Study Phase 3
             Scope        East Cement Creek Basin
             Method       Study
             Project Cost  $101,000
             Fiscal Year  FY 2022-2023
                          This study will include flow monitoring and identification of problem sections.  It will also include
             Description  smoke testing and television inspection of selected sections.  The study will recommend projects
                          to address the most critical inflow/infiltration areas.
             Impact on
             Operating    This is a study; there will be no impact on the operating budget until projects are identified.
             Budget

             Bailey Boswell 12" Sanitary Sewer Extension
             Scope        Jarvis Rd. to Saginaw Blvd.
             Method       Bore and Open Cut
             Project Cost  $700,000
             Fiscal Year  Future CIP
                          This project will provide sewer service to new development along Bailey Boswell.  This cost
             Description  estimate assumes construction of the sewer line before or concurrent with the construction of
                          new development.
             Impact on    There will be an eventual increase in maintenance costs as this is a new sewer line.  As the
             Operating    infrastructure ages, estimated annual maintenance cost will be $2,735.
             Budget

             Infiltration/Inflow (I/I) Study Phase 4
             Scope        Big Fossil Creek Basin
             Method       Study
             Project Cost  $101,000
             Fiscal Year  FY 2023-2024
                          This study will include flow monitoring and identification of problem sections.  It will also include
             Description  smoke testing and television inspection of selected sections.  The study will recommend projects
                          to address the most critical inflow/infiltration areas.
             Impact on
             Operating    This is a study; there will be no impact on the operating budget until projects are identified.
             Budget