Page 207 - GFOA Draft 2
P. 207
£ ¤
Ú
287
4 Ú
Bailey Boswell Road
12 FM 156
Ú
1 Ú
Ú
Saginaw Blvd
Old Decatur Road Ú Ú
13
Ú
2
9
Ú Ú E McLeroy Blvd
6 5 Ú Ú
Ú ÚÚ Ú
Ú
W McLeroy Blvd Ú
8 FM 156
3
11 10 7
£ ¤ Ú Ú Ú Ú
287
Ú Ú Ú Ú
Longhorn Road E Industrial Ave
Matchline
Matchline
2021-2026 Street CIP
1) Knowles Dr. Ph 1 Reconstruction to 2 Lanes and Drainage Improvements
2) Knowles Dr. Ph 2 Reconstruction to 3 Lanes and Roundabout at McLeroy
3) Knowles Dr. Ph 3 Reconstruction to 3 Lanes and Drainage Improvements
4) Old Decatur Road North
5) W. McLeroy Blvd. Ph. 3 Reconstruction
6) W. McLeroy Blvd. Ph. 4 Reconstruction
7) Industrial & FM 156 Intersection
8) Thompson Sidewalks
9) E. McLeroy Blvd. Ph. 2 Reconstruction
10) Industrial Blvd. Reconstruction Phase 1
11) Industrial Blvd. Reconstruction Phase 2
12) Basswood Boulevard - Narrowing and Intersection Improvements
13) E. McLeroy Blvd. (Western Center Extension)
City of Saginaw, Texas Map Disclaimer
This map product is for informational
2022 CIP Update purposes and may not have been
prepared for or be suitable for legal,
engineering, or surveying purposes.
STREET CIP It does not represent an on-the-ground
S
only
the
survey
represents
and
approximate relative location of property
Table of Contents July 2022 boundaries. 200