                                GOALS, OBJECTIVES, AND PERFORMANCE MEASURES
                                                        2022-2023


                                                 WATER & WASTEWATER


                                    FY 2021-2022                FY 2021-2022                FY 2022-2023
               City Strategy
                                   Department Goal          Department Achievement         Department Goal

                                                         Accomplished maintaining reserves
                              Maintain reserves at 25% of the  at 25% of the Enterprise Fund  Maintain reserves at 25% of the
                             Enterprise Fund operating budget.                        Enterprise Fund operating budget.
                                                                operating budget.


                              Complete the Northwest Booster  Northwest Booster Pump Station  Complete the Northwest & Beltmill
                Maintain a   Pump Station, Saginaw Boulevard  delayed due to material shortages.  Booster Pump Stations, Complete
                financially    16" water line phase 2 and Fort  Saginaw Blvd 16" water line is  the Fort Worth meter station
                sound city     Worth meter station upgrade.        complete.                   upgrade.
                 providing
                 superior
                 services    Complete the Resiliency Study and  Resiliency and Emergency
                             Emergency Response Plan by June  Response Plan completed before  Complete Water Quality Report and
                                                                                      distribute to customers by July 1st
                                        2022.                     June 2022
                               Complete replacement of water  Completed the replacement of  Begin change out of Commercial
                               meters with those using cellular  residential water meters to the new  Meter's over to the cellular
                                      technology.              cellular technology            technology.




                                               LONG TERM OBJECTIVES

             Implement a leak detection/water loss program on our water system.

             Replace water lines as designated on the Capital Improvements Plan.

             Perform random water meter accuracy tests throughout the system.

             Replace wastewater lines as designated on the Capital Improvements Plan.

             Inspect, reseal and/or replace, as necessary, all wastewater manholes.

             Maintain current certi cations through continuing education credits and seek new certi cations.
             Promote the “Clean It Like You Mean It” program to rid the City of hazardous waste, tires, etc.






















      Table of Contents                                                                                           187
   187   188   189   190   191   192   193   194   195   196   197