ADOPTED | BUDGET


          Drainage Projects

              Street Drainage Improvements will be performed in multiple  locations in the City during
               2022/2023 to help restore positive drainage at some of the 206 locations identified in the City.
               This project will help to remove standing water problems, which contribute to the premature
               deterioration of asphalt on City streets.

          Utility Projects

              Sewer Manhole Replacement and Rehabilitation efforts will continue in 2022/2023 to replace
               and restore 150 of the 660 manholes currently in need of replacement.  This project helps to
               reduce overall sewer treatment costs to the city by reducing the inflow infiltration from rainwater
               into the sewer system.