Page 439 - CityofColleyvilleFY23AdoptedBudget
P. 439
Stormwater Master Plan
rogram Description
The purpose of the Stormwater Master Plan is to provide a comprehensive evaluation of the city’s existing drainage and creek
system. The goal of the study is to develop a prioritization list with associated capital costs to help program future stormwater
needs and projects.
Total Project Cost $155,000
Potential Operational Cost Increase $0; There are no annual operational costs associated with this study.
Strategic Plan Connection
3.3 Mitigate stormwater runoff and ooding risks
City of Colleyville | Budget Book 2023 Page 439