Page 194 - Project Detail Sheet_AdoptedBook
P. 194
ADOPTED | BUDGET
Utility Capital Projects
Department Project Title Project Number
Public Works Wastewater Manhole Replacement and Rehabilitation Project (2022) UT2201
Project Description
This project will replace or rehabilitate roughly 150 wastewater manholes throughout the City. The Department has identified three
different rehabilitation techniques for this project. Each technique brings value to the project based on the need of the manhole that
needs repair. The three techniques include: total reconstruction, cured-in-place fiberglass manhole liner, and sprayed epoxy
manhole liner. After completion of the rehabilitation process of a manhole, the system will experience less inflow/infiltration due to
rainwater and have less risk of a major wastewater issue resulting from a manhole collapse.
Project Justification
Staff completed an inspection of approximately 5,500 manholes in recent years. The inspection assessed each manhole on overall
structural condition, maintenance responsibility, and degree of inflow/infiltration. Each manhole was given a numerical grade on
structural and maintenance condition, with inflow/infiltration being noted as observed. All manholes were inspected by one staff
member so grading would be consistent among all manholes. The manholes that makeup the 660 that need attention were graded
poor and very poor, and were noted to have inflow/infiltration. Inflow/infiltration in the wastewater system causes capacity issues with
the possibility of creating sanitary sewer overflows, and also results in higher wastewater treatment charges. The inspections
revealed that 660 (12%) of the manholes needed some form of replacement or rehabilitation. This project is part of a multi-year
effort to complete all 660 manholes.
Funding Source: Utility Fund Reserves (410).
Project Schedule Beginning Date Ending Date History Fiscal Year Amount
Professional Services Proposed 2021-22 $250,000
Engineering/Design Total $250,000
Land/ROW Acquisition
Construction 10/2021 09/2025
Other
Total Schedule 10/2021 09/2025
Sources of Funds Appr. To Date 2021‐22 Budget 2022‐23 Estimate 2023‐Completion Total Funding
General Obligation Bonds
Certificates of Obligation
Federal/State Grants
Reserves 0 250,000 0 750,000 $1,000,000
Sales Tax
Other
Total Funding $0 $250,000 $0 $750,000 $1,000,000
Project Costs To Date 2021‐22 Budget 2022‐23 Estimate 2023‐Completion Total Cost
Professional Services
Engineering/Design
Land/ROW Acquisition
Construction 0 250,000 0 750,000 $1,000,000
Other
Total Costs $0 $250,000 $0 $750,000 $1,000,000
Operating Impact
No operating impact is anticipated.
Fiscal Year 2020‐21 2021‐22 2022‐23 2023‐24 2024‐25 Total Impact
Amount $0 $0 $0 $0 $0 $0
188