Page 277 - City of Colleyville FY22 Adopted Budget
P. 277

Exhibit A
                                                    City of Colleyville
                                                Capital Improvement Plan
                                                     Fiscal Year 2022
                                                   Project Descriptions


    Master Plans/Studies

    Lift Stations Condition Assessment

    Program Description                                            Strategic Plan Connection
    This project will provide for a conditional assessment of the   3.2 Ensure regular repair and replacement of water and
    lift stations currently in operation.                          wastewater facilities


    Total Project Cost  $75,000
           Category                     Type                       Funding Source                  2022
    Master Plans/Studies  Wastewater Renewals             Capital Utility Fund                      $75,000.00







    Pavement Condition Assessment
    Program Description                                            Strategic Plan Connection
    Utilizing advanced survey technology, information on           3.4 Thoroughly plan for future capital investments and
    pavement distresses and structural strenght will be collected   associated costs
    for the street network. The pavement condition index (PCI),
    as a condition rating index, assists with developing
    rehabilitiation and replacement strategies for the street
    network.

    Total Project Cost  $75,000

           Category                     Type                       Funding Source                  2022
    Master Plans/Studies  Street Network                  Capital Projects Fund                     $75,000.00






    Water Project 3: Elevated Storage Tank‐Study

    Program Description                                            Strategic Plan Connection
    Hydraulic study to evaluate any significant potential system   3.2 Ensure regular repair and replacement of water and
    improvements gained through the addition of a new 1MG          wastewater facilities
    storage tank as identified in the 2014 Water and Wastewater
    Master Plan.

    Total Project Cost  $50,000
           Category                     Type                       Funding Source                  2022
    Master Plans/Studies  Water Renewals                  Capital Utility Fund                      $50,000.00







                                                                                                          275
   272   273   274   275   276   277   278   279   280   281   282