CITY OF SAGINAW
                            GOALS, OBJECTIVES AND PERFORMANCE MEASURES
                                                        2019-2020

            WATER & WASTEWATER

                City             FY 2018-2019                 FY 2018-2019                  FY 2019-2020
              Strategy         Department Goal           Department Achievement            Department Goal



                        Maintain reserves at 25% of the Enterprise Reserves were maintained over 25% of Maintain reserves at 25% of the Enterprise
                        Fund operating budget.       the Enterprise Fund operating budget.  Fund operating budget.





                        Maintain Moody's rating of Aa3 and  The bonds ratings were maintained.  Maintain Moody's rating of Aa3 and
                        Standard and Poor's rating of AA/Stable.                   Standard and Poor's rating of AA/Stable.

              Maintain a
            financially sound
             City providing                          Construction of the Saginaw Boulevard
              superior   Completed  design  of  the  Saginaw  12" water line phase 2 was completed. Construct  the Saginaw Boulevard 16"
              services  Boulevard 16" water line phase 2.  Design for the 16" water line is 60% water line phase 2.
                                                     complete.


                        Complete construction of the Fairmont 12"   Design for the Fairmont 12" sewer   Complete construction of the Fairmont 12"
                            sewer rehabilitation phase 1.  rehabilitation project is 100% complete.  sewer rehabilitation phase 1.




                        Complete miscellaneous projects identified                 Complete miscellaneous projects identified
                         during phase 1 of the inflow/infiltration   Inflow and infiltration repairs began.  during phase 3 of the inflow/infiltration
                                    study.                                                      study.


                                                  LONG TERM OBJECTIVES

            Implement a leak detection/water loss program on our water system.

            Replace water lines as designated on the Capital Improvements Plan.

            Perform random water meter accuracy tests throughout the system.

            Replace wastewater lines as designated on the Capital Improvements Plan.

            Inspect, reseal and/or replace, as necessary, all wastewater manholes.

            Maintain current certifications through continuing education credits and seek new certifications.

            Promote the “Clean It Like You Mean It” program to rid the City of hazardous waste, tires, etc.