Exhibit A
                                                    City of Colleyville
                                                Capital Improvement Plan
                                                     Fiscal Year 2020
                                                   Project Descriptions


    Water

    L.D. Lockett Pump Station Emergency Generator

    Program Description                                            Strategic Plan Connection
    The project will provide for the design specifications and     3.4 Thoroughly plan for future capital investments and
    construction  of a backup generator at the LD Lockett pump     associated costs
    station to provide emergency energy in the event of power
    outage.


    Total Project Cost  $650,000
            Category                    Type                       Funding Source                   2020
    Water                   Equipment                   Capital Utility Fund                         $650,000.00







    Pleasant Run Road Waterline (John McCain North to Bear Creek) ‐ Construction
    Program Description                                            Strategic Plan Connection
    The project includes the reconstruction of Pleasant Run Road   3.2 Ensure regular repair and replacement of water and
    to include storm drainage, ribbon curbs, and the installation   wastewater facilities
    of ~3,700 linear feet of 10" PVC water line along Pleasant
    Run, as per the 2014 Water and Wastewater Master Plan.

    Total Project Cost  $800,000
            Category                    Type                       Funding Source                   2020
    Water                   Water Renewals              Water Impact Fees                            $800,000.00







    Pleasant Run Waterline Vault ‐ Construction

    Program Description                                            Strategic Plan Connection
    The project includes installation of a waterline vault on      3.2 Ensure regular repair and replacement of water and
    Pleasant Run Road at the north city limit.                     wastewater facilities

    Total Project Cost  $375,000

            Category                    Type                       Funding Source                   2020
    Water                   Water Renewals              Capital Utility Fund                         $375,000.00