Exhibit A
City of Colleyville
Capital Improvement Plan
Fiscal Year 2020
Project Descriptions
Master Plans/Studies
Drainage Fee Assessment Study
Program Description Strategic Plan Connection
The purpose of the drainage fee assessment study is to 3.3 Mitigate stormwater runoff and flooding risks
determine if the rates charged are appropriate.
Total Project Cost $50,000
Category Type Funding Source 2020
Master Plans/Studies Master Plans/Studies TIF $50,000.00
Water Risk and Resilience Assessment
Program Description Strategic Plan Connection
This project is for a Water Risk and Resilience Assessment as 3.2 Ensure regular replacement of water and
per the October 23, 2018 law, America's Water Infrastructure wastewater facilities
Act (AWIA). The law requires community (drinking) water
systems serving more than 3,300 people to develop or
update risk assessments and emergency response plans
(ERPs).
Total Project Cost $100,000
Category Type Funding Source 2020
Master Plans/Studies Master Plans/Studies Capital Utility Fund $100,000.00
Water, Wastewater, and Roadway Impact Fee Update
Program Description Strategic Plan Connection
This project will issue a contract for the technical analysis 3.4 Thoroughly plan for future capital investments and
required by Chapter 395 of the Texas Local Government code associated costs
to determine the maximum water, wastewater, and roadway
impact fees that may be assessed.
Total Project Cost $128,000
Category Type Funding Source 2020
Master Plans/Studies Master Plans/Studies Impact Fees‐Area I (E of SH26) $32,000.00
Master Plans/Studies Master Plans/Studies Impact Fees‐Area II (W of SH26) $32,000.00
Master Plans/Studies Master Plans/Studies Wastewater Impact Fees $32,000.00
Master Plans/Studies Master Plans/Studies Water Impact Fees $32,000.00