                                   FISCAL YEARS 2019‐2023 STORM WATER UTILITY CAPITAL BUDGET

                Department                Project             Adopted 2019  Preliminary 2020  Preliminary 2021  Preliminary 2022  Preliminary 2023
            Stormwater Utility  Annual Localized Drainage Projects  $425,000  $2,500,000  $2,129,000  $2,934,000  $3,534,000
            Stormwater Utility  Harvest Hills & Briar Meadow Drainage Improvements  $0  $6,000,000  $0  $0     $0
            Stormwater Utility  Matthews Court Drainage Improvements  $8,500,000  $0      $0        $0         $0
            Stormwater Utility  Tributary CC2(360 to Susan) Conceptual Study  $250,000  $300,000  $0  $3,000,000  $0
            Stormwater Utility  JC‐9 (Cooper to Collins)             $0     $300,000  $400,000      $0    $4,000,000
            Stormwater Utility  California Lane Drainage Improvements  $330,000  $500,000  $3,000,000  $2,000,000  $0
            Floodplain Management
            Stormwater Utility  Flood Mitigation Buyouts         $3,500,000  $1,000,000  $500,000  $500,000  $500,000
            Maintenance
            Stormwater Utility  2017 Bridge Maintenance           $150,000      $0        $0        $0         $0
            Stormwater Utility  Annual Bridge, Channel and Infrastructure Maintenance  $285,000  $810,000  $1,210,000  $810,000  $1,210,000
            Annual Contracts or Programs
            Stormwater Utility  Construction Materials Testing    $100,000  $100,000  $100,000   $100,000  $100,000
            Stormwater Utility  Irrigation                        $40,000    $40,000   $40,000   $40,000    $40,000
            Stormwater Utility  Development Review (Flood Study and Detention Analysis)  $50,000  $50,000  $50,000  $50,000  $50,000
            Stormwater Utility  Stormwater Review Consulting      $100,000  $100,000  $100,000   $100,000  $100,000
            Stormwater Utility  Watershed Model Maintenance       $50,000   $100,000  $100,000   $100,000  $100,000
            Stormwater Utility  Survey and Elevation Certificates    $0      $10,000   $10,000   $10,000    $10,000
            Stormwater Utility  Flood Monitoring System           $30,000    $20,000   $20,000   $15,000    $15,000
            Erosion Protection/Repair Projects
            Stormwater Utility  Kee Branch Trib 1 (Green Oaks to Oak Springs) Erosion  $0  $2,500,000  $0  $0  $0
            Stormwater Utility  Kee Branch Trib 4 (Deaver Park to Andalusia Trail) Erosion  $2,500,000  $0  $0  $0  $0
            Stormwater Utility  Woodland Dr. Erosion              $200,000  $200,000  $2,000,000    $0         $0
            Stormwater Utility  Lower Johnson Creek Dredging Evaluation  $250,000  $0     $0        $0         $0
            Stormwater Utility  2019 Ditch Maintenance               $0     $600,000      $0        $0         $0
            Stormwater Utility  Annual Miscellaneous Erosion Projects  $0       $0   $1,000,000  $1,000,000  $1,000,000
                                                     GRAND TOTAL  $16,760,000  $15,130,000  $10,659,000  $10,659,000  $10,659,000