Page 236 - FY 19 Budget Forecast 91218.xlsx
P. 236

WATER UTILITIES DEPARTMENT
                            WATER PRODUCTION DIVISION (200-730-74)



               DEPARTMENT DESCRIPTION:
               The Water Production Division is responsible for securing from the City of Fort Worth an adequate supply of potable
               water in compliance with State and Federal regulations for the city. The division is also responsible to conduct system
               quality tests and water tank (x5) operations and maintenance.


               DEPARTMENT/DIVISION GOALS:
               1.  Provide an adequate supply of safe, potable water.
               2.  Monitor pumping stations and storage tanks through the Supervisory Control and Data Acquisition (SCADA) system.

               3.  Maintain the appearance and good working condition of water pumping stations and storage facilities.
               3.  Comply with State and Federal regulations regarding water quality, etc.


               DEPARTMENT/DIVISION OBJECTIVES:
               1.  Perform site inspections to ensure that facilities are secure and equipment is functioning properly.
               2.  Coordinate facility grounds maintenance at all water production sites.
               3.  Monitor water quality and flush dead-end water lines in order to maintain disinfectant residuals.
               4.  Collect required water samples in compliance with the EPA and Texas Commission on Environmental
               Quality.
               5.  Collect new construction water samples and deliver to laboratory for analysis.
               6.  Perform required water quality field testing to comply with the Nitrification Action Plan (NAP).
               7.  Begin required Water Tank rehabs for all tanks over the next 5 years.

               SERVICE LEVEL ANALYSIS:
                                                                                         FY 2018-19
                                                   FY 2016-17   FY 2017-18   FY 2017-18   Adopted
               SERVICES PROVIDED                     Actual      Budget      YE Proj.     Budget
               Total gallons purchased (million gallons)  2,926.5  3,000.0    3,000.0      3,000.0
               Peak day water demand (million gallons)  15.8       22.0        22.0         22.0
               Daily site inspections performed       1,872        N/A         1,872       1,872
               Water samples collected/tested          662         720         700          700
               Dead-end water lines flushed           1,308       1,300        1,300       1,300
               # of water pressure complaints received  53         N/A          54           50
               # of water complaints (taste & odor)    39          N/A          18           20


               PERFORMANCE INDICATORS
               % of monthly bacteriological samples testing   100%  100%       100%        100%
               negative for coliform organisms
               % of required flushed as scheduled     100%        100%         100%        100%
               % of required inspections as scheduled  100%       100%         100%        100%



















                                                            234
   231   232   233   234   235   236   237   238   239   240   241