PUBLIC WORKS DEPARTMENT
                           STREET MAINTENANCE DIVISION (100-500-51)




               DEPARTMENT DESCRIPTION:
               The Street Maintenance Division of the Public Works Department is responsible for the maintenance and repair of all
               publically owned streets and sidewalks. This includes the repair and maintenance of concrete and asphalt pavements,
               sidewalks, curb and gutter, signs, pavement markings, traffic signals, school zones, and guardrails.

               DEPARTMENT/DIVISION GOALS:
               1. Continuously review processes to determine operational improvement and maintenance cost reduction opportunities.
               2. Respond to emergency repair calls (Stop and Yield signs, Traffic and School Zone signals, blocked roads…) within 24
               hrs.
               3. Manage the sidewalk program with a goal to reduce backlog needs to less than 30 days.
               4. Sweep the public street as required by the MS4 permit.
               5. Leverage technology to track and manage all work activities.
               6. Leverage county partnerships to maximize roadway maintenance activities.
               7. Manage the Pavement Management System and its associated recommended annual maintenance schedule.



               SERVICE LEVEL ANALYSIS:
                                                                                       FY 2018-19
                                                    FY 2016-17   FY 2017-18   FY 2017-18   Adopted
               SERVICES PROVIDED                      Actual     Budget      YE Proj.    Budget
               Total Lane-miles of roadway maintained.  505        505         484         484
               Curb miles of street sweeping completed  876.5     1,000        850        1,000
               Acres of contracted right of way mowing.  240       240         240         240
               Acres of city mowed right of way.      10.65       10.00       7.00        6.00
               Linear feet of sidewalks repaired.     2,441       4,000       4,000       4,000
               Lane miles of pavement crack-sealed     52.6        50          50          50
               Tons of Asphalt used.                  3,345       4,000       4,000       3,500

               PERFORMANCE INDICATORS
               % of Streets Swept at least 3x per year  -           -           -          100
               % of r/w mowed at least 6x per year      -           -           -          100
               % of sidewalk backlog more than 30days   -           -           -          25
               % of Pavement addressed per the PMS      -           -           -          100
               % of Sidewalk maintained on Schedule     -           -           -          100
               % of Roadway system above 70 PCI         -           -           -          70