Page 183 - City of Arlington FY19 Adopted Operating Budget
P. 183

Enterprise Funds





            STORM WATER UTILITY: Mindy Carmichael, Director

            Department Narrative                   At A Glance

            The Stormwater Division is responsible for     31 Authorized Positions
            the City’s stormwater conveyance systems.     Budget Break Down
            The mission of the division is reducing the      Personnel Services      $2,780,618
            potential for stormwater  damage to  public   Operating Expenses       4,611,390
            health, safety, life, property, and the     Capital Outlay            320,000
            environment.   Programs associated with      Total                 $7,712,008
            achieving this mission include:
                                                   Budget Highlights
              Floodplain management and watershed
               planning to identify flood risks and     New Civil Engineer $100,731
               preserve and enhance aquatic and      One-time funding for new FTE $5,000
               riparian environments;
              Planning and implementation of flood   Goals and Objectives
               mitigation projects;
              Inspection and maintenance of the     Goal:  Mitigate Flood Risks and Protect Stormwater
               stormwater conveyance system;           Infrastructure
              Protection of water quality from        o  Objective:  Plan and Implement Stormwater Projects
                                                       o  Objective: Complete Watershed Studies for Each
               sediment and pollutants; and
              Outreach to the public related to           Watershed within the City
               flooding and water quality.

            Revenue for this fund is generated through
            the Stormwater Utility Fee which is paid by
            owners  of commercial and  residential
            property through the City’s water utility billing.
            Grants and revenue bonds may also be used
            to fund the Stormwater Capital Program.




            City‐wide Budget Impacts
            FY 2019 expenditures are impacted by a targeted 2.5% - 5.7% compensation adjustment depending on their job classification
            effective February 2019.  Additionally, the city’s contribution to employee health coverage will increase by 4% in FY 2019.


            Scorecard

                         Storm Water Utility Fund             FY 2016      FY 2017       FY 2018      FY 2019
                             Key Measures                      Actual       Actual       Estimate      Target
             % storm drainage inlets inspected (current total number
             of inlets = 13,098; City of Arlington owned = 9,705)   100%        100%         100%          100%
             %  concrete channels inspected (total linear feet =
             174,376; City of Arlington owned = 166,730)          100%          100%         100%          100%
             % of residential street lane miles that have been swept
             compared to annual goal of 1,604                      96%           88%         100%          100%




             2019 Adopted Budget and Business Plan                                        168                                                                  City of Arlington, Texas
   178   179   180   181   182   183   184   185   186   187   188